Wire Rope Inspection Verification Site Case Study

Wire Rope Inspection Verification Site Case Study

Time: Feb. 7th 2023

Location: Construction site in Hong Kong

Purpose: to verify TCK.W device on the work site

Device model: TCK.W ZN1650 Portable device

Inspection process:

1. Customer has found a sample rope and tightened the rope to be straight.


2. Customer uses TCK.W magnetizer to magnetize the rope from left to right.


合作项目图、大型工程案例(好处:展示公司实力

3. Bench marking

让国外买家更放心合作)

4. Customer uses TCK.W detector to inspect the rope from left to right.


5. Inspection result is shown on the handheld display.

合作项目图、大型工程案例(好处:展示公司实力

6. The rope looks smooth on the surface but the device shows big spike so customer decides to open the rope on the site to verify the defect.

让国外买家更放心合作)

The position of first defect is at 2.8m. The inspection curve is as below.

When customer opens the rope and finds two broken strands inside which is resulted with corrosion.

Conclusion: The rope is suggested to be discarded imm


Get the latest price? We'll respond as soon as possible(within 12 hours)
This field is required
This field is required
Required and valid email address
This field is required
This field is required